• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Innovative Manufacturers Center

Driving Manufacturing Growth and Job Creation in Central Pennsylvania

(570) 329-3200
  • Careers
  • IMC Blog
  • News
  • Contact Us
  • About Us
    • IMC Service Area
    • IMC Team
    • Success Stories
    • Central PA Manufacturing Companies
    • Partners & Network
    • Career Opportunities
    • Contact Us
  • Services
    • People
      • Brand Development
      • Business Continuity Planning
      • Elevating HR Practices for Manufacturing Success
      • Environmental & Safety Compliance
      • Lean Manufacturing User's Group
      • Manufacturing Business Growth Services
      • Sales Development
      • Tooling U-SME
    • Processes
      • Continuous Improvement
      • International Trade & Export Compliance
      • ISO 9001 Certification
      • ISO Support
      • Lean Manufacturing Level One Certification
      • Lean Manufacturing Transformation
      • Problem Solving with Root Cause Analysis
      • Supply Chain Optimization
    • Technology
      • Clean Energy Manufacturing
      • Digital Marketing & SEO
      • SMART-PA
      • Technology Scouting
      • Website Design
    • Innovation
      • Innovation Engineering Systems
      • Manufacturing Innovation
      • R&D Tax Credits
      • Technology and Innovation
      • Williamsport/Lycoming KIZ
        • About the Williamsport/Lycoming KIZ
        • Do I Qualify for the KIZ?
        • KIZ Tax Credits
        • Williamsport/Lycoming KIZ Benefits
        • Williamsport/Lycoming KIZ Services
  • Events
  • Training
    • People
      • Meeting the HR Challenge
    • Processes
      • ISO 9001 Certification
      • Lean Manufacturing Practitioner Certification
      • Problem Solving with RCA

Where Your Productivity Problem Is Hiding

image_pdfPrint PDFimage_printPrint

The farther we get from the production line, the less adept we are at managing productivity.

(IW – William Heitman: 3-10-16)    A global auto parts manufacturer was introducing a new engine component and wanted to use more digital technology for its assembly and packaging.

Its industrial engineers designed a full-scale prototype and proceeded to testing. Videos and other documentation ensured relentless scrutiny, fine-tuning and consistency.

The results were impressive: factory labor was cut by more than half.

Although the team’s actions seemed instinctive, they followed a centuries-old “industrialization” process that balances three characteristics of effective work: standardization, specialization of labor and management of worker autonomy. As they would eventually learn—painfully—these characteristics apply to any work anywhere in the company.

For example, the new robotics required more rigorous levels of parts interchangeability. This required that existing standardization for parts be improved to levels measured in microns. Next, the work activities had to be redistributed among new machines and workers. The existing specialization of labor was redesigned. Job roles and tasks were restructured. Finally, the new robotic process required changes to the workers’ traditional decision-making authority—their autonomy. A new schedule of worker decision authority was specified and managed as precisely as a parts list for inventory.

The goal of industrialization is to harmonize the operation of tangible capital—machinery—with intangible capital, especially human activity and know-how. Well-documented records of work methods allow businesses to convert the skills of individual workers, which are costs, into institutional knowledge, which is an asset.

This institutional knowledge is the company’s “experience curve.” It is a critical component of the intangible capital that accounts for a majority of the value of businesses today. It provides a formidable barrier to competitors. And, ideally, it advances in a never-ending march of increasing refinement.

Like any asset, however, the experience curve can be underused and its value wasted. Anything that reintroduces errors, ambiguity or variance undermines a painstakingly developed experience curve.

Often this wasted value is the unintended consequence of an otherwise well-intentioned improvement. Call it “Virtuous Waste.”

Unfortunately, a malfunctioning experience curve will not leak oil or flash a warning buzzer. This intangibility, plus the good intentions that inadvertently created the waste, means the symptoms will likely be overlooked and misinterpreted.

And that is precisely what happened a year later at the auto parts maker. Downtime had increased gradually and persistently. No one knew why. To investigate, engineers added a new digital entry station to each machine operator’s station. The plan was for workers to enter the reasons for machine downtime directly into the plant control system.

In theory, this was an excellent idea. In practice, it only created a new problem: each digital station used a free-text entry field. No standardized directions, codes or drop-down menus were provided. This allowed each operator to describe a downtime root cause “using his own words.” The result: an entry station at a single machine typically generated more than a thousand “falsely unique” descriptions.

In hindsight, the problem was obvious. The implementation of the digital entry stations ignored the three elements of industrialization: standardization, specialization of labor and management of worker autonomy. The solution was simple: integrate these elements into root cause identification.

The hard part was recognizing that the well-intentioned digital improvements had backfired. Virtuous Waste is difficult to spot and painful to acknowledge. It’s a psychological problem, not a technical problem.

The improvement team worked quickly to industrialize. It discovered that many causes were merely identical problems worded differently. Fewer than a dozen causes accounted for three-quarters of the downtime. Standardized drop-down menus were added to the entry stations.

More than half of the newly standardized causes, however, involved operator error: misunderstanding the operating instructions, mistreating the equipment or misdiagnosing the problem. Thus new rules to manage worker autonomy were needed. The plant changed workers’ “decision rights” and introduced specialization of labor for diagnosis. An operator could enter simple causes. More complex causes required consultation between the operator and his supervisor. A third category required diagnostic tests prior to entry. All of this was documented on laminated cards mounted next to the entry stations.

Downtime was cut by three-quarters in eight months.

Want to find a treasure trove of Virtuous Waste improvements in your business, as this manufacturer did? Search beyond historically industrialized areas. Industrialization receives generous management attention when it involves the direct activities of production. Look at worker activities that are about production, that are one step removed from the line. Scrutinize them every bit as scrupulously.

(William Heitman is managing director at The Lab Consulting, which has been implementing non-technology business improvements since 1993. He holds an MBA from The Wharton School of the UofP.)

image_pdfPrint PDFimage_printPrint

Filed Under: News

Primary Sidebar

Search

Blog Categories

  • IMC Blog
  • News
  • Success Stories

Blog Archives

Testimonials


Northway Industries, Inc.

“Through the Winning Teams program, we increased throughput in our laminate cleaning/inspection area by 18%, which also shortened the time for us to respond to vendors about defective products and t… Read more

Northway Industries, Inc.


Rockland Manufacturing Co.

“We’re very pleased with the results of the training. It was a great way to break the ice regarding a systemic change in one of our oldest and most experience facilities. By training on change man… Read more

Bo PrattPresidentRockland Manufacturing Co.


Pik Rite, Inc.

The IMC and its staff have played an integral part in the success of Pik Rite’s Continuous Improvement culture as well as directly influencing more efficient production and operations. The proof is … Read more

Caleb ThomasProduct Line ManagerPik Rite, Inc.


NuVisions Center

We are a small organization and do not have IT staff. Before we found IMC, the task to implement CMMC seemed almost insurmountable. With their help, the process was no longer overwhelming, and we were… Read more

Terry KnouseVice President of OperationsNuVisions Center


SilcoTek

5 Whys, SIPOC, Value Stream Maps, etc. are great ways to visualize problems that are difficult to pinpoint.

Brandon SmithQuality Control Lead TechnicianSilcoTek


Prysmian Group

The attendees of both training programs came away energized and eager to apply their new skills in training, coaching and communications. There is broad consensus that these skills should continue to … Read more

Jeanette WraggTraining ManagerPrysmian Group


Nittany Paper Mills, Inc.

We make investments where and when our workforce is skilled and ready.  The training was a solid foundation for supervisor development.

Steve PrentissVice President of Human ResourcesNittany Paper Mills, Inc.


QCast Aluminum

The Value Stream Mapping exercise conducted by the IMC enabled us to visually see the overall production process and the areas we needed to target for improvement. Without this process, QCast may not … Read more

Terry ArnoldGeneral ManagerQCast Aluminum


Lang’s Chocolates

IMC’s resource consultant’s background and knowledge were so relevant, and his delivery set a solid foundation upon which we could build for our re-certification as well.

Robert LangOwnerLang’s Chocolates


Metal Integrity

“IMC has been an excellent resource for us to accomplish objectives that we would not have been able to achieve on our own. We would highly recommend any company taking full advantage of the services … Read more

Marc DagataPresidentMetal Integrity




Newsletter Signup

Sign up for IMC’s newsletter to get the latest news on manufacturing in Central Pennsylvania.

"*" indicates required fields

By providing your email, you agree to receive future email correspondence from IMC.

This field is for validation purposes and should be left unchanged.









Upcoming Events



May


12


Featured


Featured


May 12 @ 8:00 am – May 16 @ 4:00 pm


Lean Manufacturing Practitioner Certification



May


15


Featured


Featured


9:00 am – 12:00 pm


Understanding Costs and Profits for Manufacturing Supervisors



May


15


2:00 pm – 3:00 pm


CMMC Compliance Made Affordable: Budgeting & Enclaving Tips



Jun


18


Featured


Featured


9:00 am – 11:00 am


Fundamentals of Maintenance Management – Williamsport



Jun


19


Featured


Featured


9:00 am – 11:00 am


Fundamentals of Maintenance Management – Altoona


View Calendar


News

What’s So Cool About Manufacturing Video Contest Announces 2025 Central Susquehanna Awards

IMC is excited to announce the award recipients for the “What’s So Cool About Manufacturing?” (WSCM) Central Susquehanna student video contest awards.  The annual awards ceremony was held April 23rd at The Venue at Liberty …

Read More

IMC Announces the Release of its Central Pennsylvania Manufacturing Tariff Poll Results

We are pleased to announce the results of our Central Pennsylvania Manufacturing Tariff Poll. This initiative aimed to gather insights from regional manufacturers regarding the potential impact of proposed tariffs on the region’s manufacturing sector. We …

Read More

Central PA Manufacturing Tariff Poll

This poll is now closed. Thank you to everyone who participated. Please watch our e-news and socials for follow-up information regarding the results. Central PA manufacturers, your participation is crucial in helping us understand …

Read More
Copyright © 2025 IMC, Inc - Site Developed by Pineapple PC
One College Avenue, Dept. 32 Williamsport, PA 17701-5799